Phoenix Contact

Phoenix Contact

Background


84,000 Square Foot Bldg Addition. Design Build- HVAC & Plumbing. Connector Wing with Mechanical Room, Test Lab, Office area. Distribution Center with 40 foot high automated racking system, Production Area and Loading Dock.


Scope of Project


HVAC
Five Air Handling Units: Modular, Chilled water & Hot water coils, energy recover wheel, supply & exhaust fans, with full economizer capability.
Boiler: copper-fin coil, sealed combustion, 2000 MBH, circulation pump.
Cooling & Heating Base-mounted pumps: with VFD drives.
Roof Exhaust fans.
Horizontal Unit heaters, Cabinet Unit heaters, Air Curtains at loading dock door VAV boxes with heating coils for Office areas.

Two Computer room A/C units (CRAC): Horizontal 12-ton, electric reheat, humidifiers and standalone controls. Ducted overhead system with common supply diffusers.
Fin-tube radiation: Pedestal type at Distribution Center window area.

Piping:
4-pipe chilled & heating water: black steel, Vic fittings & copper 2” and smaller.
Domestic cold & hot water: Copper Vic fittings on mains, soldered 2” and smaller.
Compressed air: Copper Vic fittings on mains, soldered 2” and smaller. (No outlets).
Gas piping: black steel, welded mains, threaded 2” and smaller.

Insulation: Thickness to meet Energy code, See specification below.
Sheetmetal ductwork to meet SMACNA standards, diffusers and grilles.

Bldg ATC: Siemens Controls to match existing systems.


Plumbing

Plumbing fixtures: All water closets wall-mount, electric water heaters.

Piping to 5 feet outside of bldg.:

Domestic cold & hot water: Copper Vic fittings on mains, soldered 2” and smaller.
Compressed air: Copper Vic fittings on mains, soldered 2” and smaller.

Gas piping: black steel, welded mains, threaded 2” and smaller.
Storm and sanitary piping: PVC below ground, Cast Iron no-hub above ground.

Insulation: Thickness to meet Energy code, See specification below. Backflow preventor and pressure regulator in new addition.

Floor drains: cast iron and cleanouts to meet code. A/C Condensate is pipe to storm system or to grade to meet local code.

Primary & Secondary Roof drains: cast iron with poly strainers.

Scope increase to include Chiller & Tower:

York Centrifugal chiller, 300-ton with VFD drive.
Cooling tower, tower pumps and chemical treatment.


Design Professional

Brandstetter Architect:

Architekturburo Brandstetter

Potsdamer Strasse 14

31812 Bad Pyrmont Germany


General Contractor:

Kinsley Construction, Inc.

2700 Water Street

PO Box 2886

York, PA 17405

 

Value

Base Project $ 2,129,800

Chiller & Tower $376,734

 

 